Skip to content

Industrial project

Motor Control Centre & APFC Upgrade for a Food Processing Plant

A new motor control centre and automatic power factor correction that improved uptime and removed power-factor charges for a processing plant.

Location
Thika, Kiambu
Completed
May 2026

This is an illustrative sample project showing a typical Sunskey solution. Figures are indicative.

The challenge

Ageing starter panels caused frequent motor trips and long fault-finding, while a low power factor was adding reactive-power charges to the monthly electricity bill.

Our solution

We designed, built and installed a new MCC with VFDs on the largest pumps and fans, and an APFC panel sized from a power quality study — staging the changeover over weekends to avoid lost production.

The outcome

Power factor now holds close to target, power-factor charges have been eliminated, and clear indication and protection make faults quick to find.

Project gallery

Start your project

Ready to power up your next project?

Electrical or solar, supply or full installation — get a tailored proposal from our engineers, designed around your site, your loads and your budget. No obligation.

Call WhatsApp Get a Quote