Skip to content

Commercial project

LV Switchboard, DB & Changeover Upgrade for an Office Block

Replacement of an overloaded LV switchboard and floor DBs, with automatic generator changeover and UPS protection for a multi-tenant office block.

Location
Westlands, Nairobi
Completed
July 2026

This is an illustrative sample project showing a typical Sunskey solution. Figures are indicative.

The challenge

The building’s original switchboard was overloaded and difficult to maintain, and tenants lost power for several minutes every outage while the generator was switched over by hand.

Our solution

We supplied and installed a new LV main switchboard, upgraded every floor DB with correctly rated protection, and added an automatic changeover with generator auto-start and an online UPS for the server room.

The outcome

Tenants now switch to generator power automatically within seconds, the server room rides through outages, and each floor is safely protected and clearly labelled.

Project gallery

Start your project

Ready to power up your next project?

Electrical or solar, supply or full installation — get a tailored proposal from our engineers, designed around your site, your loads and your budget. No obligation.

Call WhatsApp Get a Quote